USS S-25
USS S-25 in 1923 or 1924, possibly off New London, Connecticut.
| |
History | |
---|---|
United States | |
Name | USS S-25 |
Builder | Fore River Shipyard, Quincy, Massachusetts |
Laid down | 26 October 1918 |
Launched | 29 May 1922 |
Sponsored by | Mrs. Vera Hobart Schlabach |
Commissioned | 9 July 1923 |
Decommissioned | 4 November 1941 |
Fate | Transferred to United Kingdom 4 November 1941 |
Royal NavyUnited Kingdom | |
Name | HMS P.551 |
Acquired | 4 November 1941 |
Fate | Loaned to Polish government-in-exile 4 November 1941 |
Poland | |
Name | ORP Jastrząb |
Namesake | Hawk |
Acquired | 4 November 1941 |
Commissioned | 4 November 1941 |
Fate | Sunk 2 May 1942 |
General characteristics | |
Class and type | S-class submarine |
Displacement |
|
Length | 219 ft 3 in (66.83 m) |
Beam | 20 ft 8 in (6.30 m) |
Draft | 15 ft 11 in (4.85 m) |
Speed |
|
Complement | 42 officers and men |
Armament |
|
USS S-25 (SS-130) was a first-group (S-1 or "Holland") S-class submarine of the United States Navy.
Construction and commissioning
[edit]S-25 was laid down on 26 October 1918 by the Fore River Shipbuilding Corporation in Quincy, Massachusetts. She was launched on 29 May 1922. sponsored by Mrs. Vera Hobart Schlabach, wife of Ross P. Schlabach, USN, and commissioned on 9 July 1923.
Service history
[edit]U.S. Navy
[edit]Operating New London, Connecticut, in 1923, S-25 participated in winter maneuvers in the Caribbean Sea and the Panama Canal Zone area from January to April 1924. Then transferred to the United States West Coast, she operated primarily in the waters off Southern California until 1931. Fleet Problems and division exercises during that period took her back to the Panama Canal area from March to May 1927, to Hawaii in 1927 and 1928, to the Panama Canal area again in February 1929, and to Hawaii again in 1930.
Transferred again, S-25 departed San Diego, California, on 15 April 1931 and arrived at Pearl Harbor, Hawaii, on 25 April 1931. She operated in Hawaiian waters until 1939.
S-25 cleared Pearl Harbor to return to the United States East Coast on 16 June 1939 and arrived at New London on 25 August 1939. Voyage repairs followed, and in February 1940 she was assigned to a test and evaluation division at New London. In December 1940 she was detached and ordered to Key West, Florida, where she provided training services until May 1941. She then returned to New London to prepare for transfer to the United Kingdom under the terms of the Lend-Lease agreement. She was decommissioned on 4 November 1941.
Royal Navy
[edit]On the day of her decommissioning, S-25 was transferred to the United Kingdom, which renamed her HMS P.551. Later the same day, however, the Royal Navy loaned her to the Polish Navy.
Polish Navy
[edit]Polish Navy Lieutenant Commander Bolesław Romanowski accepted P.551 on behalf of the Polish government-in-exile. The Polish Navy commissioned her immediately as ORP Jastrząb for World War II service.
While traveling in an Allied convoy near Norway, Jastrzab strayed some 100 nautical miles (190 km; 120 mi) off her proper course[citation needed], and on 2 May 1942 was mistakenly sunk by friendly fire by the British destroyer HMS St Albans (ex-USS Thomas (DD-182)) and minesweeper HMS Seagull.
References
[edit]This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
External links
[edit]- Photo gallery of S-25 at NavSource Naval History
71°30′N 12°32′E / 71.500°N 12.533°E
- United States S-class submarines
- Ships built in Quincy, Massachusetts
- 1922 ships
- Ships transferred from the United States Navy to the Royal Navy
- Ships transferred from the United States Navy to the Polish Navy
- Maritime incidents in May 1942
- Friendly fire incidents of World War II
- United States submarine stubs